| Profile |
| Switchboards |
| Switchboards |
| Switchboards |
| Email Us |

| Managing Director: | Terry Apps |
| Manager: | Dieter Seidel |
|
![]() | A-Line Switchboards, an Australian company, are recognised as one of the top switchboard builders in the country. Based in Melbourne, A-Line custom manufacture main switchboards, distribution switchboards, and take off boxes for use in both the Australian and overseas markets. |
A-Line also produce a superior metal ducting system which it distributes to a variety of users in many differing areas of industry. Specified in some of Australia's leading food manufacturing and processing plants, it is used to comply with rigid health and safety regulations as well as for its proven durability. | ![]() |
![]() | A-Line Switchboards incorporate CAD drafting and test certificates with all their work and can supply the added service of a mobile workshop and temporary main switchboard for shutdown works. |
A-Line have been playing an integral role in powering some of Melbourne's most famous and modern buildings such as: Bourke Place, National Bank House, Greensborough Shopping Centre, Australia on Collins, National Gallery of Australia, Melbourne Town Hall, St. Vincent's Hospital, Lonsdale Street Telephone Exchange. | ![]() |
The Apps Group of Companies (incorporating Apps Electrics Pty Ltd; A-Line Switchboards and Apps Communications) stand by their products and services, none more so than A-Line Switchboards who can rightly be proud of the example they have set within the electrical industry.
![]() Busbars for change-over system in a main switchboard for large shopping centre (Greensborough) | ![]() Metering and Control section for Telecom exchange main switchboard |

Transducers, Relays, Protection (Phase Failure)
Relays and Metering Facilities on
Main Switchboard for Bank Headquarters 
Busbars with Temperature Detection,
Current Transformers for protection
and metering on main switchboard for
Telecom exchange.
Switchboards

Mobile Workshop at Monash University for Change-Over of Supply Transformer and Main Switchboard with Protection Devices. 
Main switchboard during assembly in
electrical section of the workshop. 
Main Switchboard completed
after final test ready for packing. 
Neutral Earthing Resistor Cubicle 
Main Switchboard.